Skip to main content
Portfolio

Mission-critical
platforms.

We build and back infrastructure platforms that enable next-generation computing--from powered campuses to grid enablement.

345 MW

Total IT Capacity

375

Acres Secured

4

Strategic Locations

2

States

Current Portfolio

India Operations

Our Launch Market

Hyperscale campuses in Karnataka and Tamil Nadu, complemented by strategic edge facilities serving coastal logistics and industrial manufacturing corridors.

Bengaluru

Development
Karnataka, India

Bengaluru AI Compute Campus

Greenfield hyperscale data center campus in Karnataka's designated Renewable Energy Zone with 150 acres of secured land. Direct access to 400/220 kV pooling station infrastructure. Phase 1 designed for GPU-dense AI workloads with liquid cooling and multi-hundred megawatt expansion optionality.

150 MW
Phase 1 Capacity
150 Acres
Land Secured
400/220 kV
Power Access
Dual Substations
Redundancy
Key Highlights
  • Dual independent substation feeds for N+1 power redundancy
  • Adjacent to 400/220 kV, 4x500 MVA pooling station infrastructure
  • Located in Karnataka REZ with renewable energy integration
📍 12.9716° N, 77.5946° E

Chennai

Development
Tamil Nadu, India

Chennai North Hyperscale Campus

Greenfield hyperscale campus near Pulicat Lake in Thiruvallur district with 150 acres of secured land. Strategic position 60 km north of Chennai with access to 1,500 MW Vallur Thermal Power Station grid infrastructure and proximity to Chennai's submarine cable landing stations. Designed for AI compute with high-density hyperscale configuration.

120 MW
Phase 1 Capacity
150 Acres
Land Secured
110/220 kV
Power Access
<60 km
Cable Proximity
Key Highlights
  • Dual substation connectivity to Vallur Thermal Power Station (1,500 MW)
  • 60 km proximity to Chennai submarine cable landing stations (17 international cables)
  • Adjacent to North Chennai industrial corridor and Sri City SEZ
📍 13.4167° N, 80.3167° E

Mangalore

Development
Karnataka, India

Mangaluru Coastal Edge Campus

Edge data center positioned in India's emerging coastal data center hub with 40 acres of secured land in Mangalore SEZ. Direct access to international submarine cable routes and proximity to New Mangalore Port (India's 7th largest container port). Designed for low-latency edge computing and logistics-connected workloads.

40 MW
Total IT Load
40 Acres
Land Secured
220 kV Grid
Power Access
<8 km
Port Proximity
Key Highlights
  • Strategic location in Mangalore SEZ with 190 MVA power capacity
  • Direct access to international submarine cable landing potential
  • 220 kV substation connectivity with 400 kV Kadandale backup
📍 12.9141° N, 74.8560° E

Coimbatore

Development
Tamil Nadu, India

Coimbatore Industrial Edge Campus

Edge data center serving Tamil Nadu's manufacturing and industrial corridor with 35 acres of secured land. Proximity to 6,600+ MSMEs in CODISSIA industrial parks. Positioned in Tier II city with Tamil Nadu Data Centre Policy incentives, dual-grid power access, and smart city fiber infrastructure.

35 MW
Total IT Load
35 Acres
Land Secured
Dual Grid
Power Access
6,600+
MSME Ecosystem
Key Highlights
  • Tamil Nadu Data Centre Policy: dual grid access, 100% electricity duty waiver
  • Proximity to CODISSIA industrial parks (320+ MSMEs, Rs.3,000 Cr investment)
  • Access to 42,417 MW Tamil Nadu grid with low outage frequency
📍 11.0168° N, 76.9558° E

Why We Started Here

Market Drivers

  • Fastest-growing data center market in APAC
  • 1.4B+ digital consumers, data localization mandates
  • Strategic gateway to Southeast Asia

Infrastructure Edge

  • Submarine cable landing stations (SEA-ME-WE)
  • Abundant renewable energy + grid capacity
  • World-class technical talent pool
Expansion Pipeline

Growing Globally

Extending our emerging markets thesis beyond India into high-growth regions with similar structural advantages.

Coming Soon
🌍

Africa

East Africa Focus

Connectivity infrastructure and power generation serving the continent's fastest-growing digital economies.

Target: 2027
Coming Soon
🏝️

Indonesia

Java & Sumatra

Southeast Asia's largest economy with massive hyperscale demand and submarine cable connectivity.

Target: 2027
Coming Soon
🏔️

Nepal

Kathmandu Valley

South Asia edge infrastructure with hydropower integration and regional connectivity.

Target: 2027

Our Investment Criteria

Every project must deliver mission-critical uptime with disciplined execution, secure power access, and network density.

Power First

Dual-feed utility access, secured capacity, and clear path to energization with utility partnerships.

🌐

Network Dense

Carrier-neutral fiber diversity, low-latency profiles, and proximity to cloud on-ramps and exchanges.

🏗️

Executable

Permitting certainty, EPC relationships, constructability, and timeline confidence from day one.

Let's build together.

We're building the infrastructure that powers emerging markets' digital future. Join us.

Hyperscalers
Pre-lease capacity
Institutional LPs
Co-investment opportunities
Utilities & EPCs
Strategic partnerships
Landowners
Site acquisition